Harpers Ferry Tunnel

Harpers Ferry Tunnel: Phase II of The National Gateway Clearance Improvement Project. LRL removed the brick lined portion of the tunnel from springline to springline and supported the ground with rock bolts and shotcrete. The east portal was supported with steel sets. Strip Drain was installed throughout the tunnel to help with water seepage and a new drain system was installed for positive water flow. The west portal was lined in concrete and required notching. Both portals were mucked and backfilled with concrete. This project was completed injury free, ahead of schedule and under live track.

Project Photos

LRL Construction Co, Inc.
P.O. Box 432
7165 Fairview Road
Tillamook, OR 97141

503-842-5520
503-842-5501 (Fax)
info@lrlconstruction.com

1734 Fayetteville Hwy.
Lewisburg, TN 37091

Oregon CCB #116166
Washington CCB #LRLCOC041JQ

LRL Construction Co, Inc.

P.O. Box 432
7165 Fairview Road
Tillamook, OR 97141

503-842-5520
503-842-5501 (Fax)

1734 Fayetteville Hwy.
Lewisburg, TN 37091
 

info@lrlconstruction.com

Oregon CCB #116166 · Washington CCB #LRLCOC041JQ