Whitesboro Culvert

LRL Constructed 5, 120′ CMP, and Liner Plate tunnels for flood diversion.

LRL joint ventured in the patent of a new pipe ramming method utilizing liner plate instead of steel casing pipe for 72″ drainage culverts, this method can save the client up to 30% in materials comparing it to the conventional steel casing and is relatively close to the same time to install.